Thursday, 19 March 2009

All dried up

Knowing that all this will have to be dismantled yet again doesn't help. All the baseboards have now been bolted together and I am replacing all the legs with a newer design incorporating adjustable feet, (a necessity as the floor is so uneven ) Although I've extended the baseboards as far as I can, I'm not sure if I am going to get away with it as I have no access to the window and this worries me as it is South facing and needs to be opened in those hot summer months.

I have now altered some of the baseboards to give me access to the window and also started on the elevated area of the layout. This is a raised section which runs around the outer area of the layout and is about 4 inches higher than the main boards.

No comments: